Temperature variation of "Bajina Bašta" dam between 1995-2015 / Temperature u brani i akumulaciji "Bajina Bašta" u periodu 1995-2015
(Građevinski fakultet, Subotica, 2016)
In this paper, the data for the observed temperatures (of the air, body of the dam and water in the reservoir), for "Bajina Bašta" Dam, during the 20-years period, are presented. The data were used to predict the unsteady ...
On the role of circular sections of quadric surfaces
(Innsbruck University Press, Innsbruck, 2014)
As a part of new advanced course curriculum of Descriptive geometry, in the Faculty of Civil engineering, creative 3D modeling of specific structures is included. These structures, inspired by contemporary architecture ...
ODŠTETNI ZAHTEVI NA GRAĐEVINSKIM PROJEKTIMA – KVANTIFIKACIJA I PREVENCIJA / CLAIMS ON CONSTRUCTION PROJECTS – QUANTIFICATION AND PREVENTION
(Contemporary Construction Practice 2018, 2018)
Odštetni zahtevi predstavljaju veoma značajnu temu zato što njihova novčana vrednost može biti vrlo velika dok kvantifikacija nije egzaktna i kreće se u praksi u rasponu 1:3 u zavisnosti od primenjenih metoda koje su redom ...
Genetic algorithms for assigning tasks to construction machine operators / Genetski algoritmi za rasporedivanje rukovatelja gradevinskih strojeva
(Croatian Association of Civil Engineers, 2011)
The authors describe the methodology for using genetic algorithms in solving problems of optimum assignment of tasks to construction machinery operators, aimed at achieving maximum efficiency. A special emphasis is placed ...
Current strategy for highway construction in the Republic of Serbia / Aktuelna strategija realizacije izgradnje autoputeva u Republici Srbiji
(Društvo građevinskih konstruktera, Beograd, 2014)
In order to achieve the economic development of the Republic of Serbia, it is necessary to provide adequate traffic infrastructure, particularly highways. The second lane on the northern branch of Corridor X (E-75) from ...
Application of Fuzzy Logic on Selection of Contractors for Construction of High Rise Buildings
(Institute of Physics Publishing, 2019)
Selection process of a construction contractor is highly important and successful implementation of a project and realization of sustainability are largely dependent on it. Computer programs - expert systems - may be used ...
Ex post analysis of road projects: resilience to crisis
(Editorial Board EJTIR, 2018)
This investigation aimed to reveal a mechanism of how different road projects' settings respond to macro-economic crisis. Qualitative and quantitative analyses were performed over a sample of 31 European road projects, in ...
Digital representation of as-damaged reinforced concrete bridges
(University of Belgrade Faculty of Civil Engineering, 2020)
Inspection of bridges has been a standard assessment procedure for decades. Its purpose
is to identify and record all defects of the bridge structure. Normally used inspection
techniques are rather simple, mainly relying ...
Upravljanje rizicima pri izgradnji kapitalnih infrastrukturnih objekata u cilju poboljšanja njihove održivosti / Risk management during planning and construction of large infrastructure projects for improving their sustainability
(Универзитет у Београду, Грађевински факултет, 2015)
Investicioni projekat u građevinarstvu se definiše kao kompleksan tehničko-tehnološki,organizacioni, pravni, ekonomski i finansijski poduhvat koji se sastoji od skupakoordinisanih i kontrolisanih aktivnosti sa jasno ...
Application of fuzzy ahp method based on eigenvalues for decision making in construction industry
(Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek, 2016)
The Analytic Hierarchy Process (AHP) has found wide application for multicriteria decision making (MCDM) in various areas. In the paper is given a short survey of the AHP application for decision making in the construction ...