Optimalna politika održavanja drumskih mostova u Srbiji
(Put i saobraćaj, 2015)
Information system for planning and control of project realization in construction / Informacioni sistem za planiranje i kontrolu realizacije projekata u građevinarstvu
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2005)
The information system for planning and control of project realization in construction industry is presented in this paper. For this information system the process and data model are described. The information system is ...
Implementing a detailed estimation model on housing project prefeasibility studies / Primena detaljnog modela procene za potrebe izrade predinvesticionih studija za projekte izgradnje stambeno-poslovnih objekata
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2010)
In this paper, a new approach is presented for the purpose of making prefeasibility studies. It is based on the detailed estimation of costs and durations even though there is no design present at the beginning of the ...
Human resource performance measurement framework for construction projects and companies
(Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek, 2014)
A new approach for measuring the performance of employees in construction companies is presented. Two different methods are proposed. For employees directly engaged on a project, performance is measured by using different ...
Methods of calculating depreciation expenses of construction machinery / Metode proračuna troškova depresijacija građevinskih mašina
(Institut za istraživanja i projektovanja u privredi, Beograd, 2012)
Depreciation expenses represent a significant part of total expenses of construction machinery. Precise calculation of depreciation expenses is often difficult or impossible. Straight line method of depreciation, which is ...
Ex post analysis of road projects: resilience to crisis
(Editorial Board EJTIR, 2018)
This investigation aimed to reveal a mechanism of how different road projects' settings respond to macro-economic crisis. Qualitative and quantitative analyses were performed over a sample of 31 European road projects, in ...
Estimating residual value of heavy construction equipment using ensemble learning
(http://cedb.asce.org, 2021)
Knowing the right moment for the sale of used heavy construction equipment is important information for every construction company. The proposed methodology uses ensemble machine learning techniques to estimate the price ...
Database for management of concrete batch plant work / Baza podataka za upravljanje radom fabrike betona
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
A relational database that is designed and implemented for use in one concrete batch plant, with maximal production 30 m3/h, is presented in this paper. The database is developed using programming package Microsoft Access ...
Particle swarm optimization / Optimizacija pomoću članova rojeva
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2008)
In this work is presented one newer method for optimization of continuous functions which belongs to the heuristic stochastic methods, i.e. to the methods of so called swarm intelligence. This method is mathematically and ...
Application of fuzzy ahp method based on eigenvalues for decision making in construction industry
(Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek, 2016)
The Analytic Hierarchy Process (AHP) has found wide application for multicriteria decision making (MCDM) in various areas. In the paper is given a short survey of the AHP application for decision making in the construction ...