Приказ резултата 81-90 од 185
Tehnologija građevinskih radova
(Građevinski fakultet u Beogradu, 2015)
Genetic algorithms for assigning tasks to construction machine operators / Genetski algoritmi za rasporedivanje rukovatelja gradevinskih strojeva
(Croatian Association of Civil Engineers, 2011)
The authors describe the methodology for using genetic algorithms in solving problems of optimum assignment of tasks to construction machinery operators, aimed at achieving maximum efficiency. A special emphasis is placed ...
ODŠTETNI ZAHTEVI NA GRAĐEVINSKIM PROJEKTIMA – KVANTIFIKACIJA I PREVENCIJA / CLAIMS ON CONSTRUCTION PROJECTS – QUANTIFICATION AND PREVENTION
(Contemporary Construction Practice 2018, 2018)
Odštetni zahtevi predstavljaju veoma značajnu temu zato što njihova novčana vrednost može biti vrlo velika dok kvantifikacija nije egzaktna i kreće se u praksi u rasponu 1:3 u zavisnosti od primenjenih metoda koje su redom ...
Cost-oriented analysis of fibre reinforced concrete column-supported flat slabs construction
(Journal of Building Engineering, 2022)
Fibre reinforced concrete (FRC) is increasingly being used in elements with high structural responsibility, the constructed FRC column-supported flat slabs (CSFSs, hereinafter) with partial or even total substitution of ...
Formiranje i značaj baze istorijskih podataka. Izrada post-projektne analize
(XXI Internacionalni simpozijum iz projektnog menadžmenta. Značaj projektnog menadžmenta. Prvih 30 godina YUPMA i 50 godina IPMA, 19-20 maj, Beograd, 2016)
U ovom radu je opisan značaj formiranja baze istorijskih podataka. Jedan od značaja se ogleda i u izradi post-projektne analize gde baza istorijskih podataka predstavlja gradivnu literaturu. Usled nedostatka standardne ...
Database for management of concrete batch plant work / Baza podataka za upravljanje radom fabrike betona
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
A relational database that is designed and implemented for use in one concrete batch plant, with maximal production 30 m3/h, is presented in this paper. The database is developed using programming package Microsoft Access ...
Data-Driven Housing Damage and Repair Cost Prediction Framework Based on The 2010 Kraljevo Earthquake Data
(16th World Conference on Earthquake Engineering (16WCEE), 2017)
This paper presents an earthquake damage and repair cost prediction framework for individual residential buildings and portfolios of residential buildings in a municipal area in a region where the seismological networks ...
Temperature variation of "Bajina Bašta" dam between 1995-2015 / Temperature u brani i akumulaciji "Bajina Bašta" u periodu 1995-2015
(Građevinski fakultet, Subotica, 2016)
In this paper, the data for the observed temperatures (of the air, body of the dam and water in the reservoir), for "Bajina Bašta" Dam, during the 20-years period, are presented. The data were used to predict the unsteady ...
Quality control plans for road bridges
(Maintenance, Monitoring, Safety, Risk and Resilience of Bridges and Bridge Networks, 2016)
Building a Construction Project Key-Phrase Network from Unstructured Text Documents
(American Society of Civil Engineers (ASCE), 2017)
During a construction project lifecycle, an extensive corpus of unstructured or semistructured text documents is generated. The nature of unstructured sources impedes users' acquisition, analysis, and reuse of relevant ...