Претраживање
Приказ резултата 1-4 од 4
Implementing a detailed estimation model on housing project prefeasibility studies / Primena detaljnog modela procene za potrebe izrade predinvesticionih studija za projekte izgradnje stambeno-poslovnih objekata
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2010)
In this paper, a new approach is presented for the purpose of making prefeasibility studies. It is based on the detailed estimation of costs and durations even though there is no design present at the beginning of the ...
Information system for planing and control of project realization
(Brno University of Technology, Faculty of Civil Engineering, 2010)
Project realization includes a lot of participants and information. Collecting and storing a huge amount of information is not an easy process. Integrated system for project management can make the process of collecting ...
Methodology of Design Organization Structure for Management Team at a Large Project
(Univerzitet Crne Gore, Građevinski fakultet, 2010)
The realization of large investment projects is an extremely complex undertaking both from technical and technological, as well as the organizational, legal and financial standpoint. Certainly that approach to the realization ...
Solving the Situation of Airport Bled by Digital Terrain Modeling Using the Software Package Rinoceros
(Belgrade: Faculty of Architecture in Belgrade; Serbian Society for Geometry and Graphics (SUGIG), 2010)
In the paper, we conducted an examination of topographical
conditions of the airport Bled location, using the digital terrain
modeling. A detailed analysis of the ambience around the airport is
done in relation to natural ...