Search
Now showing items 1-10 of 29
Human resource performance measurement framework for construction projects and companies
(Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek, 2014)
A new approach for measuring the performance of employees in construction companies is presented. Two different methods are proposed. For employees directly engaged on a project, performance is measured by using different ...
Methods of calculating depreciation expenses of construction machinery / Metode proračuna troškova depresijacija građevinskih mašina
(Institut za istraživanja i projektovanja u privredi, Beograd, 2012)
Depreciation expenses represent a significant part of total expenses of construction machinery. Precise calculation of depreciation expenses is often difficult or impossible. Straight line method of depreciation, which is ...
An approach and software for analysis of financial and economic risks in feasibility study preparation / Pristup i računarski program za analizu finansijskih i ekonomskih rizika pri izradi studije opravdanosti
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2013)
Risk is defined as an uncertain event or a condition that, if occurs, could affect project goals. In recent literature the importance of studying uncertainty is underlined, especially in early project phases. In this paper, ...
Work cycle based scheduling
(Croatian Association of Civil Engineers, 2013)
The paper proposes a new approach to short-term scheduling based on spatial and technological cycles, continuous crew flows and daily scheduling, named WCBS (Work Cycle Based Scheduling). Application of WCBS is shown on a ...
Application of particle swarms for project time-cost optimization
(Union of Croatian Civil Engineers and Technicians, 2014)
The time-cost optimization of a construction project, as related to the costs of its activities and the total project realization costs, is considered in this paper. Direct and indirect costs, durations of all activities, ...
Investment strategy for ensuring quality of finishing works on residential buildings
(Union of Croatian Civil Engineers and Technicians, 2015)
The relationship between the quality of finishing works, costs, market value, and profit, is presented and explained for residential buildings. The results show that the higher quality of finishing works increases profit ...
Application of modified fuzzy TOPSIS method for multicriteria decisions in civil engineering / Primena modifikovanog rasplinutog TOPSIS metoda za višekriterijumske odluke u građevinarstvu
(Društvo za ispitivanje i istraživanje materijala i konstrukcija Srbije, Beograd, 2014)
In this paper is presented and applied one fuzzy TOPSIS method for the multicriteria ranking of objects for reconstruction and maintenance. At the beginning is given short review on the genesis and development of this ...
Current Serbian design codes: Transferring from a deterministic to a semi- probabilistic approach / Trenutni srpski propisi za proračun - prelazak sa determinističkog na polu-probabilistički pristup
(Savez inženjera i tehničara Srbije, Beograd, 2015)
The Serbian design code for reinforced concrete structures is somewhat out-of-date in its approach to structural design. In this paper, a study into the possible transition to a semi-probabilistic approach is presented. ...
Procena čvrstoće betona pri pritisku, korišćenjem različitih funkcija zrelosti betona: primer iz prakse / Assesment of concrete compressive strength using different maturity functions: case study
(Građevinski materijali i konstrukcije, 2018)
Čvrstoća pri pritisku jeste svojstvo koje je veoma značajno u građevinarstvu, te postoji izražena potreba da se razviju metode za praćenje prirasta čvrstoće pri pritisku betona u konstrukciji. Prema zakonskim propisima ...
Application of fuzzy AHP for ranking and selection of alternatives in construction project management
(Taylor and Francis Ltd., 2017)
The construction project management (CPM) is very important and large segment of entire project management (PM). Realisation of construction projects is usually long term process which requests significant financial, ...