Претраживање
Приказ резултата 1-10 од 15
Human resource performance measurement framework for construction projects and companies
(Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek, 2014)
A new approach for measuring the performance of employees in construction companies is presented. Two different methods are proposed. For employees directly engaged on a project, performance is measured by using different ...
Time-inhomogenous Markov chains in the bridge management
(Taylor and Francis - Balkema, 2014)
Available Bridge Management Systems vary in detail, but generally they comprise a deterioration model to predict condition development and a preservation optimization model to determine the optimum preservation policy. ...
Bridge failure modes due to local scour
(Taylor and Francis - Balkema, 2014)
The scour and in particular the local scour induced by flooding events is the predominant cause of bridge collapses and thus severing the related road link with adverse consequences for the road users and the society in ...
Planiranje održavanja putnih mostova
(Beograd, 2014)
Application of particle swarms for project time-cost optimization
(Union of Croatian Civil Engineers and Technicians, 2014)
The time-cost optimization of a construction project, as related to the costs of its activities and the total project realization costs, is considered in this paper. Direct and indirect costs, durations of all activities, ...
Global Perception of Sustainable Construction Project Risks
(Selected Papers From the 27th Ipma (International Project Management Association), 2014)
Sustainability goals move projects away from narrowly focused traditional management oriented ambitions of time, cost and quality, giving attention to economic, environmental and social impacts of construction projects. ...
Assessment of indirect costs due to highway link severance caused by reduction of bridge functional performance / Procena indirektnih troškova usled prekida putne veze zbog smanjenja funkcionalnih performansi mosta
(Srpsko društvo za puteve VIA-VITA, Beograd, 2014)
Stability and bearing capacity of the most important engineering structures of road sections (bridges, tunnels, viaducts, etc...) have enormous influence on the functional performance of the entire highway network. The ...
Application of modified fuzzy TOPSIS method for multicriteria decisions in civil engineering / Primena modifikovanog rasplinutog TOPSIS metoda za višekriterijumske odluke u građevinarstvu
(Društvo za ispitivanje i istraživanje materijala i konstrukcija Srbije, Beograd, 2014)
In this paper is presented and applied one fuzzy TOPSIS method for the multicriteria ranking of objects for reconstruction and maintenance. At the beginning is given short review on the genesis and development of this ...
Information systems in construction industry / Informacioni sistemi u građevinarstvu
(Savez građevinskih inženjera Srbije, Beograd, 2014)
Information system for planning and control of project realization in construction industry is analyzed in the paper. Application of information technology in the construction industry is emphasized at the beginning of ...
On the role of circular sections of quadric surfaces
(Innsbruck University Press, Innsbruck, 2014)
As a part of new advanced course curriculum of Descriptive geometry, in the Faculty of Civil engineering, creative 3D modeling of specific structures is included. These structures, inspired by contemporary architecture ...