Productivity planning and control on construction projects / Planiranje i kontrola produktivnosti na građevinskim projektima
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
In this paper, traditional as well as contemporary approaches to productivity planning and control are analyzed and potential improvements are suggested. A new approach is proposed. It is based on: applying separate measures ...
Metodology for construction equipment expense calculations used by the USACE / Metodologija proračuna troškova rada građevinskih mašina prema USACE
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2011)
Estimating expenses for Construction Equipment (CE) has a key impact on the success of civil engineering projects. The nature of these expenses is such that there is a need for a lot of assumptions during the estimating ...
Application of multiple criteria goal programming for solving some management and production problems / Primena višekriterijumskog ciljnog programiranja za rešavanje nekih problema menadžmenta i proizvodnje
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2012)
One method for solving multiple criteria fractional goal programming problem is proposed in this paper. In this method are introduced deviational variables that express increases or decreases of objective functions related ...
Implementation of value engineering on residential projects / Primena vrednosnog inženjerstva na projektima izgradnje stambeno-poslovnih objekata
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
For the purpose of further affirmation of value engineering (VE), this paper gives a contribution in developing procedures for the practical application of VE on residential projects. In accordance with the theoretical ...
An approach and software for analysis of financial and economic risks in feasibility study preparation / Pristup i računarski program za analizu finansijskih i ekonomskih rizika pri izradi studije opravdanosti
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2013)
Risk is defined as an uncertain event or a condition that, if occurs, could affect project goals. In recent literature the importance of studying uncertainty is underlined, especially in early project phases. In this paper, ...
Implementing a detailed estimation model on housing project prefeasibility studies / Primena detaljnog modela procene za potrebe izrade predinvesticionih studija za projekte izgradnje stambeno-poslovnih objekata
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2010)
In this paper, a new approach is presented for the purpose of making prefeasibility studies. It is based on the detailed estimation of costs and durations even though there is no design present at the beginning of the ...
Database for management of concrete batch plant work / Baza podataka za upravljanje radom fabrike betona
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
A relational database that is designed and implemented for use in one concrete batch plant, with maximal production 30 m3/h, is presented in this paper. The database is developed using programming package Microsoft Access ...