Productivity planning and control on construction projects / Planiranje i kontrola produktivnosti na građevinskim projektima
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
In this paper, traditional as well as contemporary approaches to productivity planning and control are analyzed and potential improvements are suggested. A new approach is proposed. It is based on: applying separate measures ...
Information technology application in construction industry / Primena informacionih tehnologija u građevinarstvu
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2004)
In this paper information technology application in construction industry is analyzed. New technology application gives new possibilities but makes new problems. Main characteristics of construction industry are emphasized ...
Information technology application planning on project in construction industry / Planiranje primene informacionih tehnologija na projektima u građevinarstvu
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2005)
Strategies for information technology application on construction project are analyzed in this paper. Construction industry and construction firms are specific, so strategies have to correspond to them. Planning problems, ...
Elementarni model za analizu i procenu troškova u građevinarstvu / Elemental Model for Cost Analysis and Estimation in Construction
(Savez građevinskih inženjera i tehničara Srbije, 1997)
U radu su kratko navedeni principi i procedure procene troškova u građevinarstvu. Posebno je ukazano na značaj rane procene troškova, koja veoma mnogo utiče na poslovnu odluku o ozbiljnijem angažovanju na projektu. Kao ...
Metodology for construction equipment expense calculations used by the USACE / Metodologija proračuna troškova rada građevinskih mašina prema USACE
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2011)
Estimating expenses for Construction Equipment (CE) has a key impact on the success of civil engineering projects. The nature of these expenses is such that there is a need for a lot of assumptions during the estimating ...
Multi criteria analysis of choosing between process based strategic planning methods / Višekriterijumska analiza izbora procesno orijentisane metode upravljanja
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2003)
In this paper all phases in quality management evolution are presented. Also, the best-known process based strategic planning methods are presented: total quality management, business process reengineering lean construction ...
Information system model of construction company / Model informacionog sistema građevinskog preduzeća
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2000)
Information system model of construction company is considered in this paper. At the beginning, the importance of information system is emphasized. The special attention is paid to information system in construction company. ...
Application of multiple criteria goal programming for solving some management and production problems / Primena višekriterijumskog ciljnog programiranja za rešavanje nekih problema menadžmenta i proizvodnje
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2012)
One method for solving multiple criteria fractional goal programming problem is proposed in this paper. In this method are introduced deviational variables that express increases or decreases of objective functions related ...
Implementation of value engineering on residential projects / Primena vrednosnog inženjerstva na projektima izgradnje stambeno-poslovnih objekata
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
For the purpose of further affirmation of value engineering (VE), this paper gives a contribution in developing procedures for the practical application of VE on residential projects. In accordance with the theoretical ...
An approach and software for analysis of financial and economic risks in feasibility study preparation / Pristup i računarski program za analizu finansijskih i ekonomskih rizika pri izradi studije opravdanosti
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2013)
Risk is defined as an uncertain event or a condition that, if occurs, could affect project goals. In recent literature the importance of studying uncertainty is underlined, especially in early project phases. In this paper, ...