Pretraživanje
Prikaz rezultata 21-30 od 144
Motorway Horgos Novi Sad (second phase) Serbia
(London ; New York: Routledge, 2017)
Određivanje in-situ koeficijenta trenja i imperfekcije kablova za prednaprezanje / Determination of the in situ coefficient of friction and imperfection of prestressing cables
(Građevinski materijali i konstrukcije, 2017)
Prestressing structural elements allows an increase in the spans of reinforced concrete structures. In the design and dimensioning of prestressed reinforced concrete structures it is necessary to know, that is to adopt a ...
An approach and software for analysis of financial and economic risks in feasibility study preparation / Pristup i računarski program za analizu finansijskih i ekonomskih rizika pri izradi studije opravdanosti
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2013)
Risk is defined as an uncertain event or a condition that, if occurs, could affect project goals. In recent literature the importance of studying uncertainty is underlined, especially in early project phases. In this paper, ...
Global Perception of Sustainable Construction Project Risks
(Selected Papers From the 27th Ipma (International Project Management Association), 2014)
Sustainability goals move projects away from narrowly focused traditional management oriented ambitions of time, cost and quality, giving attention to economic, environmental and social impacts of construction projects. ...
Moisture content influence on thermal conductivity of concrete / Uticaj sadržaja vlage na koeficijent toplotne provodnosti betona
(Građevinski fakultet Subotica, Subotica, 2016)
In this paper, physical processes of adsorption and transport of humidity, which has dominant influence on the physical and thermal characteristics of concrete, has been described. The impact of structure of concrete ...
Current Serbian design codes: Transferring from a deterministic to a semi- probabilistic approach / Trenutni srpski propisi za proračun - prelazak sa determinističkog na polu-probabilistički pristup
(Savez inženjera i tehničara Srbije, Beograd, 2015)
The Serbian design code for reinforced concrete structures is somewhat out-of-date in its approach to structural design. In this paper, a study into the possible transition to a semi-probabilistic approach is presented. ...
Prikaz vanrednog prevoza na putnoj mreži Republike Srbije
(Srpsko društvo za puteve, 2020)
U radu je dat prikaz vanrednog prevoza na putnoj mreži Republike Srbije. Razmatrane su dozvole za vanredni prevoz koje izdaje javno preduzeće Putevi Srbije za dva reprezentativna meseca april i septembar u 2019. godini. ...
Productivity planning and control on construction projects / Planiranje i kontrola produktivnosti na građevinskim projektima
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
In this paper, traditional as well as contemporary approaches to productivity planning and control are analyzed and potential improvements are suggested. A new approach is proposed. It is based on: applying separate measures ...
Optimalna politika održavanja drumskih mostova u Srbiji
(Put i saobraćaj, 2015)
Assessment of indirect costs due to highway link severance caused by reduction of bridge functional performance / Procena indirektnih troškova usled prekida putne veze zbog smanjenja funkcionalnih performansi mosta
(Srpsko društvo za puteve VIA-VITA, Beograd, 2014)
Stability and bearing capacity of the most important engineering structures of road sections (bridges, tunnels, viaducts, etc...) have enormous influence on the functional performance of the entire highway network. The ...